Skip to content
How we work

AGH Method · International Compliance

Five phases, defined deliverables and separated roles: this is how an Angolan company moves from intention to an internationally recognised certificate.

The AGH Method is aligned with international practice for management system implementation and with the DQS audit process. Each phase has an objective, concrete deliverables and a clear definition of who does what — so the company always knows where it stands and what remains.

The five phases

  1. Phase 01

    Diagnostic

    Objective: Accurately measure the gap between the company and the standard's requirements, and set priorities.

    Deliverables

    • Diagnostic report (gap analysis)
    • Prioritised work plan with deadlines

    Who does it

    AGH · Export Lab, together with the company's internal teams.

  2. Phase 02

    Preparation and Implementation

    Objective: Design and implement the management system, document processes and train the teams.

    Deliverables

    • Management system manual
    • Procedures and work instructions
    • Performance indicators
    • Risk and opportunity matrix
    • Team training

    Who does it

    Export Lab consultants, with the company's process owners.

  3. Phase 03

    Verification

    Objective: Test the system before the certification audit, through internal audit and pre-audit.

    Deliverables

    • Internal audit report
    • Pre-audit report
    • Corrective action plan

    Who does it

    AGH · Export Lab auditors, independent from the teams that implemented the system.

  4. Phase 04

    Certification (DQS, independent)

    Objective: Obtain certification through an audit conducted by an independent certification body.

    Deliverables

    • Certification audit (stages 1 and 2)
    • DQS certificate

    Who does it

    DQS, fully independently from AGH.

  5. Phase 05

    Continual Improvement

    Objective: Maintain and evolve the system through the annual surveillance audit cycles.

    Deliverables

    • Continual improvement plan
    • Preparation for surveillance and recertification audits

    Who does it

    AGH · Export Lab (support) and DQS (maintenance audits).

Independence principle

AGH and the Export Lab network prepare the company. Certification is carried out by DQS, independently. Whoever prepares does not certify, and whoever certifies does not prepare — that separation is what makes the certificate credible to buyers, financiers and regulators.

Frequently asked questions

How long does the full journey take?

It depends on company size and standard, but most first-certification projects run phases 1 to 4 in six to twelve months.

Can AGH issue the certificate?

No, by design. AGH prepares; DQS certifies independently. A body that both prepared and certified the same company would lose international credibility.

Does the method apply to any standard?

Yes. The five phases apply to ISO 9001, 14001, 45001, 27001, 22000, 37001, 50001, 22301 and the other standards covered, as well as to integrated systems.

Start with Phase 1. It's free.

The diagnostic shows exactly where your company stands and what is missing to reach the certificate.

Request a diagnostic